The walk-in shower you actually pictured.
Not a product-catalog photo. A layout, a shower, and a vanity built to fit your actual room and your actual morning, done right the first time.
A bathroom remodel doesn't fail on day one. It fails a year later, when the water gets in.
- ×Waterproofing skipped or rushed, so the tile looks great for a year and then doesn't.
- ×A walk-in shower that looks like the catalog photo but doesn't actually fit the room.
- ×The layout changing mid-project because plumbing never got scoped upfront.
- ×"Six weeks" that turns into months, in the only bathroom your household has.
None of that is inevitable. It's what happens when waterproofing gets rushed and the layout gets guessed at instead of planned.
Waterproofing and layout planned first, tile second, not the other way around.
The same team designs and builds your bathroom, so nothing gets guessed at mid-project. Licensed (CSLB #1071136), insured, and building in Orange County since 2018.
See how we work, start to finish →Three steps. So you're never wondering what's next.
- 1
Tell us how you actually use the bathroom.
A larger walk-in shower, a double vanity, or both. What matters to your morning routine shapes the layout.
- 2
See the real layout and waterproofing plan first.
Before any tile goes up, you know exactly what's moving, what's staying, and what it looks like finished.
- 3
Use it, on the schedule we gave you.
If it's your only bathroom, we sequence the work and tell you honestly what to expect, before we start.
What primary bath remodels typically cost in Orange County.
These are typical market ranges for Orange County, not a KDB quote. Your real number depends on finishes and whether plumbing is moving. We'll give you an honest number after we've actually seen it.
| Project Tier | What It Is | Typical Range |
|---|---|---|
| Cosmetic Refresh | Paint, new vanity, off-the-shelf fixtures, lighting, and flooring, no plumbing moves | $15,000 - $25,000 |
| Primary Remodel | Walk-in shower upgrade, semi-custom double vanity, new tile, upgraded hardware, minor layout changes | $35,000 - $55,000 |
| Full Renovation | Full demolition, moved plumbing, freestanding tub, frameless glass shower, heated floors, custom cabinetry | $75,000 - $110,000+ |
Source: 2026 Southern California bathroom remodel cost surveys.
No shortcuts where water gets in.
You see it before we start.
Layout and waterproofing plan approved before any tile goes up, so what you approve is what actually gets built.
Waterproofing is never an upsell.
It's built into every bath remodel by default, since it's the part that decides whether the tile job actually lasts.
Open-book pricing throughout.
You see real costs as they happen, with a milestone schedule tied to real progress, not a lump estimate you have to take on faith.
A one-year workmanship warranty.
All labor is covered for a year after completion. If something isn't right, we make it right. No debate.
- Newport Beach, CA
- Huntington Beach, CA
- Costa Mesa, CA
- Villa Park, CA
- Orange, CA
- Tustin, CA
- North Tustin, CA
- Anaheim, CA
- Santa Ana, CA
- Yorba Linda, CA
- Santiago Canyon, CA
- Fullerton, CA
- Placentia, CA
- Irvine, CA
- Brea, CA