More room, without moving.
A single room or a full second story, designed and built to look like it was always part of the house, not added onto it.
What makes an addition look, and cost, like an afterthought.
- ×Plan check sending the drawings back twice, and nobody warning you that was normal.
- ×Plastic sheeting where your living room wall used to be, for a month longer than anyone said.
- ×A price that grows every time a wall opens up and something unexpected is behind it.
- ×A valley where the new roof ties into the old one, and a leak the first real winter.
All of it comes from the same root cause: design and structural review happening too late, instead of before anything gets drawn.
Structural review and design happen together, from the first sketch.
One team handles the design, the engineering questions, and the build, so a roofline or a foundation surprise doesn't derail the project halfway through. Licensed (CSLB #1071136), insured, and building in Orange County since 2018.
See how we work, start to finish →What additions typically cost in Orange County.
Additions price by the square foot more than most project types, and vary widely with foundation work. These are typical market ranges, not a KDB quote. We'll give you an honest number after we've actually seen your property. Your own range is free and takes about a week.
| Addition Type | What It Is | Typical Range |
|---|---|---|
| Single-Story Room | Bedroom or den, no plumbing | $200 - $400 / sq ft |
| Bathroom or Kitchen Extension | Plumbing-heavy addition | $350 - $650+ / sq ft |
| Second-Story Addition | Structural reinforcement, stair integration | $350 - $650+ / sq ft |
Source: 2026 Southern California home addition cost surveys.
Find the surprises on paper, not behind your walls.
An addition has to meet the house you already have: a foundation that may not carry a second story, a roof valley where new meets old, a panel with no room left. We would rather find all of it with our trades before you sign, while a change is still a line on paper. By the time we start, the people building your addition have already walked your house, priced it and planned it with you.
- Free
Tell us what your family has outgrown.
The bedroom count, the kitchen everyone crowds into, the office that's also the guest room. A call first, then a visit to your house.
- Free
Get a budget range in about a week.
From your plans or our walk-through, we give you a range and point out what moves it, like the foundation and where the new roof ties into the old one.
- Design fee or 1%
Plan it with our trades.
Our trades walk your house, price the selections you make, and the person who will run your job writes the schedule. If we're designing your addition, this happens inside the design work. If you already have plans, it's preconstruction, at 1% of your range, on additions over $200,000. Why we plan first
- Project kickoff
Sign your agreement and pick a start date.
You sign when the working budget and schedule make sense to you. Your project manager already knows your house, so day one picks up where planning left off.
What happens after you sign, from permits to the final walkthrough: see how we work.
Three questions every homeowner is really asking.
Preconstruction is how you get honest answers to all three before you sign anything.
“Will it cost what you told me?”
A price per square foot is a guess about your house. A price built after our framer, electrician and plumber have walked it is much closer to what tying into your house will really take.
“Will it finish when you said?”
The person who will run your job writes the schedule with each trade, asking how many weeks they need. It's their plan to keep, not one handed to them on the first day.
“Will I like working with you?”
You spend a few weeks with us before the big commitment. You'll know if we're people you could have a hard conversation with, because on a project this size there will be one.
No surprises after the walls go up.
You see it before we start.
The same team that designs your addition builds it, so what you approve is what actually gets built.
We handle the structural review upfront.
Foundation and framing questions get answered before design commitments, not after the permit gets kicked back.
Open-book pricing throughout.
You see real costs as they happen, with a milestone schedule tied to real progress, not a lump estimate you have to take on faith.
A one-year workmanship warranty.
All labor is covered for a year after completion. If something isn't right, we make it right. No debate.
- Newport Beach, CA
- Huntington Beach, CA
- Costa Mesa, CA
- Villa Park, CA
- Orange, CA
- Tustin, CA
- North Tustin, CA
- Anaheim, CA
- Santa Ana, CA
- Yorba Linda, CA
- Santiago Canyon, CA
- Fullerton, CA
- Placentia, CA
- Irvine, CA
- Brea, CA