ADU Construction, Orange County CA

An ADU you
can be proud of.

From a prefab to a fully custom build, we design and build your ADU as one team. No separate architect to coordinate, no handoffs, no surprises on the permit or the price. Done on schedule.

What Goes Wrong With ADUs

Most ADU horror stories aren't about the building. They're about the permit.

  • ×A plan checker applying a rule the state already overruled, and three months lost while you prove it.
  • ×A per-square-foot price that didn't include the trench from the house to the unit.
  • ×A finished unit that can't legally be rented, because replacement parking never got resolved.
  • ×A layout drawn to hit a square-foot number, with no room for a real closet or a shower anyone would use.
  • ×A place your mom still can't live in — a step at the door, a hallway a walker won't clear.
  • ×A prefab box that arrives on schedule and then sits on the pad for two months waiting on site work.

None of that is inevitable. It's what happens when the permit path and the design happen separately, instead of as one job.

Why Now

Orange County is building more ADUs than ever, and fewer single-family homes.

+40%

ADU permits issued in Orange County grew from 1,367 in 2024 to 1,916 in 2025, a two-year total of 3,283.

-20%

Single-family home permits fell over the same period, as land and home prices push more OC homeowners toward building on the lot they already own.

8-16 wks

Typical permit approval window across Orange County cities, before construction even starts.

Source: Orange County Business Journal / Cotality permit data, 2024-2025.

The Real Numbers

What ADUs typically cost in Orange County.

These are typical market ranges for Orange County, not a KDB quote. Your real number depends on your lot, finishes, and utility work. We'll give you an honest number after we've actually seen your property. Your own range is free and takes about a week.

ADU TypeWhat It IsTypical Range
Junior ADU (JADU)Converted space within your existing home footprint$60,000 - $150,000
Garage ConversionBuilt inside your existing garage structure$80,000 - $185,000
Attached ADUA new addition built onto your existing home$170,000 - $350,000
Detached ADUA standalone structure, built from the ground up$200,000 - $440,000+

One thing worth knowing before you settle on a size: California exempts ADUs under 750 square feet from most municipal impact fees, often a $10,000-$20,000 savings. We'll walk through that trade-off with you during design, not after.

Which ADU Fits Your Lot

Four ways to build one.

01

Detached ADU

A fully standalone unit in your backyard, ground-up construction. The most flexible option and the most control over layout, but the longest timeline and highest cost of the four.

02

Attached ADU

Built as an addition connected to your existing home. Can share a wall or utilities with the main house, which often trims cost and timeline versus a detached build.

03

Garage Conversion

Your existing garage becomes living space. The most cost-effective path, since the structural shell, foundation, and roof already exist. We handle the utility and code upgrades that conversion requires.

04

Junior ADU (JADU)

A smaller unit (up to 500 sq ft) built within your existing home's walls, often with an interior connection retained to the main house. The fastest and least expensive way onto this list.

Getting Started

Find the surprises on paper, not in your backyard.

An ADU hides its surprises in the ground and at the permit counter: a sewer line too shallow to reach the unit, a panel that can't carry a second kitchen, a city rule nobody checked. We would rather find all of it with our trades before you sign, while a change is still a line on paper. By the time we start, the people building your ADU have already walked your lot, priced it and planned it with you.

  1. Free

    Tell us what the ADU is actually for.

    Rental income, aging parents, adult kids, a home office. What it's for shapes both the design and the permit path, so we start there. A call first, then a visit to your lot.

  2. Free

    Get a budget range in about a week.

    From your plans or our walk of the lot, we give you a range, check what your city allows, and tell you what moves the number up or down.

  3. Design fee or 1%

    Plan it with our trades.

    Our trades walk your lot, price the selections you make, and the person who will run your job writes the schedule. If we're designing your ADU, this happens inside the design work. If you already have plans or a prefab picked, it's preconstruction, at 1% of your range. Why we plan first

  4. Project kickoff

    Sign your agreement and pick a start date.

    You sign when the working budget, permit path and schedule make sense to you. Your project manager already knows your lot, so day one picks up where planning left off.

What happens after you sign, from permits to the final walkthrough: see how we work.

Why We Plan First

Three questions every homeowner is really asking.

Preconstruction is how you get honest answers to all three before you sign anything.

“Will it cost what you told me?”

A price per square foot is a guess about your lot. A price built after our plumber, electrician and site crew have walked it already counts the trench to the unit, the panel and the sewer line.

“Will it finish when you said?”

The person who will run your job writes the schedule with each trade, asking how many weeks they need. It's their plan to keep, not one handed to them on the first day.

“Will I like working with you?”

You spend a few weeks with us before the big commitment. You'll know if we're people you could have a hard conversation with, because on a build this size there will be one.

1% of your rangeA $225,000 to $275,000 range means $2,500. You get the range free first, so you know the number before we ask for anything. When we design your ADU, this planning is part of the design.
How We Build It

One team, from design to certificate of occupancy.

You see it before we start.

The same team that designs your ADU builds it, so the layout you fall in love with is what actually gets built. Nothing lost translating an architect's plans to a separate crew.

We handle every permit.

Building permits, utility connections, and your city's specific ADU review process: we pull all of it. You don't deal with your city's planning department directly.

Open-book pricing throughout.

You see real costs as they happen, with a milestone schedule tied to real progress, not a lump estimate you have to take on faith.

A one-year workmanship warranty.

All labor is covered for a year after completion. If something isn't right, we make it right. No debate.

See the full 7-step process →
Where We Build ADUs
  • Newport Beach, CA
  • Huntington Beach, CA
  • Costa Mesa, CA
  • Villa Park, CA
  • Orange, CA
  • Tustin, CA
  • North Tustin, CA
  • Anaheim, CA
  • Santa Ana, CA
  • Yorba Linda, CA
  • Santiago Canyon, CA
  • Fullerton, CA
  • Placentia, CA
  • Irvine, CA
  • Brea, CA
ADU Questions